Skip to content
Leeds City College Printworks Campus, interior

In order to implement BIM in a YORhub project, a client should:

  1. Ensure they have suitably qualified and experienced staff in-house, if not, employ a specialist consultant with suitable qualifications and experience to deliver BIM within a Level 2 environment. Consultants who have these skills can be found on the YORconsult Framework.

 

  1. Complete the template Employer’s Information Requirements (EIR).

 

  1. Discuss with building operators, users and maintainers if they have any specific requirements. Include these in the EIR.

 

  1. Include specific BIM clauses within contract sent out to tender.

 

  1. Include any other BIM specific requirements in the Works Information, usually within the preliminaries, but can also be included within information on Contractor’s design.

BIM standard templates

Please visit the BRE BIM Level 2 Documents and Standards web page to view and download all standard BIM related documentation.