Framework

YORcivil2

Client

Leeds City Council

Contractor

Esh Construction Limited

Value

£1,600,000

Easier access to a vital transport link

New traffic signalization measures will better control the flow of traffic upon both north and south bound approaches. In addition, carriage way widening, a cut through road, resurfacing and better protection for long vehicles

Sustainability

Waste material removed from the site was was sent to other projects and recycled in other uses. The project's carbon footprint was reduced by using a single bus to transport staff to the site and operating eco-friendly cabins

A popular cycle route was maintained throughout the project and was reintegrated into the finished carriageways